Following a phase of thorough research and screening of the market, Dematic was awarded the contract to implement the overall concept as a general contractor.
The implementation included a high-bay warehouse with 16,000 pallet location and seven stacker cranes. The stacker cranes replenish the bay racks for the picking of accessories, transport larger lots on pallets via conveyors directly to the picking stations and also return cable reels for cut-to-length orders as well as the remaining reels to the high-bay warehouse. In order to optimize the utilization of the available high-bay warehouse space, the cable reels are stored in an upright/flat combination. The production and warehouse building has two-level design. A vertical conveyor connects the goods-in and goods-out level with the storage and picking level. This permits a perfect material flow with the smallest possible footprint. The planning takes future expansion options into account and makes the investment fit for further growth.
